EXPRESS SCREEDSAND AND CEMENTANHYDRATE FLOWING SCREED
Walkable SurfaceSeven days needed for both covering and curing24–48 hours after placement, no curing required
Surface FinishAchieved tolerance of +/- 10mm under a 2-meter straight edgeAchieved tolerance of +/- 5mm under a 2-meter straight edge
PerformanceProne to shrinkage, cracking and curlingVery low shrinkage and cracking. Will not curl
Strength (28 days)Compressive: 10-20 N/mm3
Flexural: 4-8 N/mm3
8–28 days to reach 90% strength
Compressive: 30 N/mm3
Flexural: 8 N/mm3
7 days to reach 90% strength
Drying Time1mm per day up to 40mm, ½ mm per day thereafter
75mm takes significantly longer to dry
Can’t be force-dried
1mm per day up to 40mm, ½mm per day thereafter
Can be force-dried using heater and dehumidifier
UFH can be commissioned after 7 days
Quality ControlOften mixed and placed by hand
Produced to fully verifiable industry standards
Conductivity1.1w/m2k2.2w/m2k – faster heat reaction time
10% saving on running cost

Please leave your details with us and we will give you a call back.

    Don’t worry, we will only contact you with regards to your enquiry and your details will be deleted forever after an appropriate period of time. We will never pass on your information to anyone else.

    Yes, I am happy for you to hold my data and send further correspondence.No, please do not send me any future correspondence

    Please contact us for a free, no obligation, quotation by completing the form below. We look forward to hearing from you.

      Don’t worry, we will only contact you with regards to your enquiry and your details will be deleted forever after an appropriate period of time. We will never pass on your information to anyone else.

      Yes, I am happy for you to hold my data and send further correspondence.No, please do not send me any future correspondence